[Submitted on 28 Jul 2026]
Abstract:Although a large amount of work has been devoted to detailed electromagnetic transient simulation in analyzing transient synchronization stability (TSS) of hybrid systems containing renewable energy equipment and synchronous generator (SG), the underlying mechanism considering complete low-voltage ride-through (LVRT) processes of renewable energy equipment remains to be studied. Taking the SG and doubly fed induction generator (SG-DFIG) parallel system as an objective, this work divides its transient processes into four different stages: pre-fault (stage 1), during-fault (stage 2), early post-fault (stage 3), and late post-fault (stage 4), based on the LVRT of the DFIG, and establishes a transient model to describe the complete 4-stage LVRT processes. By studying the condition for entering the LVRT, it is found that vast majority of faults can cause the DFIG to enter the LVRT and make the parallel system exhibit the sequential switching characteristics. Similar to the SG-SG parallel system, which can be reduced to a single SG and described by a second-order swing equation, a unified generalized swing equation (GSE) under different parameters for different stages 1, 2, and 3 is derived. Therefore, the transient stability of the parallel system can be dealt with easily, and further, an improved equal area criterion method considering two additional effects of frequency jump and nonlinear damping is proposed to evaluate the TSS. These GSE-based theoretical analysis results are all supported by extensive hardware-in-the-loop experiments and simulations. Obviously, this work provides a clearer physical picture for the TSS mechanism of the hybrid system considering complete LVRT processes, and makes a closer connection with the transient stability of traditional power systems dominated by SG.
Submission history
From: Xu Hongsheng [view email]
[v1]
Tue, 28 Jul 2026 02:20:37 UTC (6,900 KB)
0 Comments
Log in to join the conversation.No comments yet. Be the first to share your thoughts.